Select one of the questions below. Provide the calculation and analyze the exercise from both concept and problem-solving perspectives. Support your thoughts with at least one external reference (not your book).
The Critical Path: Why is it important to identify the critical path before starting a project? On what kind of projects would the critical path be irrelevant?
Concurrent Engineering (Fast Tracking): What are the disadvantages of concurrent engineering (fast-tracking)? What kinds of projects should avoid using concurrent engineering?
How is the work breakdown structure and change control connected? What are the likely outcomes if a change control process is not used? Why? What are the major differences between managing negative risks and managing positive risks (opportunities)?
Q6
Identify a public health challenge in your community and describe a current public health prevention strategy. What has been the progress or outcome of the prevention approach?